EURTEAM News Archives: September 2008
Daher designed and operates a new 15.000 m² platform in Poincy (FR77)
Daher has built a 15,000 m² platform compliant with the technical and safety requirements for the storage of chemical products (SEVESO 2 installation). Read the full press release here
Posted in DAHER
